Rails & Trails Pages

Monday, August 15, 2011

Live Steam Trip

Fellow railfan and speeder club member Fred Hoeser invited me to Hudson on Sunday, August 14th, 2011 to see the 1" scale train he had purchased.  I took railfans Joe Lewis and Ron Donaldson with me as they had never seen the St. Croix Live Steam layout.   http://www.stcroixrr.org/   To say they were impressed with the setup and amount of trackage would be an understatement!!  Here is Fred with his new Rock Island train, 1" scale.  Ready to ride behind are Joe and Ron.




Let's take a little ride:



Note the block signal.  The entire line has ABS signalling and even allows opposing train action as there are sidings along the line.  We had to wait here for a green signal.




Here's Joe riding behind steam on the same track we are on (the reason we had the red block).




Fred offered to let me run his train.  This engine has a sound system (sounds great as power is applied) with a bell and whistle.  It even has dynamic brakes.  His engine runs on 2 batteries and when the brakes are applied, the motors run in reverse--just like the real trains!!!!


There are 3 sizes of trains here.  Fred's is the middle size.  The largest is 1 1/2" scale.  We took a ride on this train, owned by the club and any member can use it:
A few shots along this line:


A large roundhouse is located in the center of the property where members can store and work on their equipment.  Here is a shot of the top of it.  A new 2-story car barn for members cars is being constructed in the back left:


Here's a few shots from inside the roundhouse:


After leaving the St. Croix Railroad we stopped at Rick Ohlf's gigantic N-gauge layout that he is constructing with the help of friend Don Shultz.  Rick says there is 2300 feet of track here and Don says it will have 15,000 trees when completed!!




After leaving here, we stopped in at Baldwin to see Jeff Ellefson's HO model railroad.  He is modelling LaCrosse to the Twin Cities with the BN and Milwaukee mainlines.  This is a really neat operational railroad and here are a few pix of his double deck setup.  Here's Jeff beside his creation:









 A great way to spend a nice Sunday in August!!

Sunday, November 28, 2010

Railfanning Wisconsin Northern 11/27/10

A friend, Brian Sykes of Atlanta, GA, and formerly of Cameron was back home for Thanksgiving.  He wanted to railfan the shortline railroad Wisconsin Northern that runs between Chippewa Falls and Barron.  It was Saturday and no trains were running but we were able to see some industries it serves.

There's a new sand business in New Auburn that will be shipping out unit trains of 100 cars.  They fill the cars with frac (short for fracture) sand that is used in oil drilling.  The sand is sent to Texas.  The first train of 60 cars was sent last week and subsequent cars will be 100 in length.

At New Auburn we found sand piled for future shipments.






They load the sand with an endloader from the "road" between the sand and track.



Frac sand is VERY FINE and hard but feels very soft to the touch.  But these piles contain lots of rocks.  Apparently this sand will be filtered or strained, and dried, when it gets to Texas.



This is the loader they use to load the cars:





And this is the equipment they use(d) to clean out and level this area:





To the left of the sand piles is a large rectangular depression they have made.  I have no idea what it is for.  Any thoughts????





We don't know where they are getting the sand.  (But we MAY have found out).
We left New Auburn and went to Bloomer where I showed Brian the new WWT shipping point.  Again, being Saturday, nothing was happening.  We found 8 tank cars waiting to be filled.  Only 6 fit on this siding so 2 were stored at PMI Steel right next to this facility.  There may be cars inside the building also.


We left Bloomer to go to Norma, on the north side of Chippewa Falls where a gigantic sand shipping facility is being built.  But on the way, north of Eagleton, I noticed some big sand piles.  So we drove over there and we THINK we have found the frac sand pit.  Again, no action or people around, but there has been recently and there's a brand new gate here.  But there's not trucks around . . . . ???



At Norma, in the wye, we found this tank car with a pump beside it.  It is being unloaded and contains dust inhibitor they put on roads.


I have taken many pictures of the sprawling new sand plant so didn't take any this time.  We were more interested in the tracks they are going to put in.  They have started dumping ballast and have lots of ties piled ready to go.  Here's a shot of where they are going to tie into the existing track.  Looks like they will hook into the long passing track that goes down the hill and switches back into the main.


After driving around Chippewa Falls looking at other rail sites, it was getting dark so we headed home.  Couldn't be late--was going to the "Unstoppable" movie.  I highly recommend it.  A great day (and the Badgers and Gophers BOTH won!!)

Wednesday, September 23, 2009

Mondovi Line

On Wednesday, September 23, three friends and I rode ATVs on "The Mondovi Line."  This is an all-terrain trail on a railroad grade and on a sand base.  Some of it has crushed limestone on it and could be ridden with a bicycle but most of it is only suitable for ATV and horseback riding.

This is the line I wrote a book about in 2008 called "The Mondovi Line."  I tried to ride my bicycle on it but it was too sandy.  This would be the first time I would see many parts of the line.

Left to right are friends Dan Morris, Terry Kirkman, and Jim Malecki:



The foundation for the Eleva depot can still be found in the grass along the trail:



We set on at Eleva and headed east to Fairchild.  The plan was to go to Fairchild and back and then to Mondovi and back.  First thing we cross the Buffalo (or Beef) River at the edge of Eleva.




Much of the trail is now overgrown with foliage, creating a neat canopy:



We quickly enter farming area:



Terry was the "engineer" on this train and he saw the most wildlife--a couple of pheasants and about a dozen wild turkeys.  Yours truly, being the caboose, only saw this ringneck as he didn't want to get out of the way and kept running down the "track."




Here we enter Strum.  The stockyard, pickle salting station, and lumber yard were on the right hand side:



The Strum depot was located in the treeline on the left of the trail:




Between Strum and Osseo is essentially a sand prairie, best suited for growing sandburs and pine trees:




We cross Tracy Valley Road.  The train crossed on a trestle here that only had 7' 9" clearance.  The trail has been drastically lowered:



We again cross the Buffalo (Beef) River on a trestle as we come to Osseo.



We enter Osseo.  The lumber yard, elevators, and depot were located on the right.  The smokestack is from the condensary.



The condensary building still stands.



Between Osseo and Fairchild we parallel US Highway 10.



Terry spotted this neat concrete sign.  It looks like it would be a railroad whistle post but it is parallel to the track.  Any ideas??



The village of Price is hardly recognizable any more.  If you have the book, compare this to the photo from the 1910s.  The pickle salting station was on the left, the train station between the track and highway (Old Highway 10) and the village buildings where the house is.  Only the Church remains (hidden by trees).



We found an Amish man picking his apples with a mobile ladder:



This is the dreaded "Price Cut."  It doesn't seem very deep but before there were trees, this cut would fill with drifted snow.  In 1917, three steam engines were caught in this cut and had to be shoveled out by hand--by people who walked from Mondovi so they could get the trains moving and their goods in.



The colors hadn't started changing much but this is one day the four of us all could "get off from work" on the same day.  It was overcast in the morning but it had rained the day before and with the heavy humidity and fog cover, there was no dust until late afternoon. 



We enter Fairchild.  The mainline was Omaha, then Chicago Northwestern, and now Union Pacific trackage.  The 2 depots sat on both sides of the mainline.



N.C. Foster built the Mondovi Line as one of 3 separate spurs radiating from Fairchild.  Another one went to Greenwood, shown in the center of the picture.   It looks like this is also an ATV Trail--which none of us knew about.  Looks like another ATV ride some day . . .




We went back to Eleva and then headed to Mondovi.  Here is where all the industries and depot were located in Mondovi.




I attended Eleva-Strum Central High School which is just across the river from the railroad.  I remember occasionally seeing the train during noon hour or football practice.  I always had thought how fun it would be to ride that train and see exactly where it went.  Now, 47 years later, I got the chance to do that.  Although it wasn't steel wheels on steel rail, rubber tires on a trail was a great way to see it.  Thanks MUCH to Dan, Terry, and Jim for a great day.  Another check-off on the "bucket list."

The End!